Featured Project
Hutchison Engineering, Inc. (HEI) was hired by the Farmington CUSD #265 to provide design and construction inspection services for track resurfacing, striping and rehabilitation of field event areas. The track resurfacing consisted of polyurethane bound rubber base mat with a structural spray application to extend the life of the new surface. The project was completed in 2018 at a total cost of $190,000.