Featured Project
Hutchison Engineering, Inc. provided design, construction observation and testing services for Farmington CUSD #265. The project consisted of resurfacing all entrances, roadways, and parking lots; and paving a new pedestrian walkway network throughout the campus. In addition to asphalt work, various concrete slabs and walkways were constructed to enhance the already in place sports complex. Coordination with the school district was critical to ensure that construction operations did not conflict with school operations.